Green Power Priority™ Explained

Green Power Priority™ is used to describe the priority given to a solar input when charging an auxiliary battery in your vehicle. For example, if a solar power input is available the maximum available solar power will be used before topping up the output charge current from another power source. Priority is given to the solar input then to AC Mains power (where applicable), then to DC Vehicle Power, the advantage of this is that it places less load on the alternator and reduces the fuel consumption of the vehicle.

Which of our products use Green Power Priority™?

A number of our products use Green Power Priority™ including:

Battery Management Systems:

The Manager30 (BMS1230S3)
The Manager15 (BMS1215S3)
The Manager30 with colour display (BMS1230S3R)

In-Vehicle Dual Battery Chargers:

BCDCN1225
BCDCN1240
BCDC1225D
BCDC1240D
BCDC1250D

Portable Dual Battery Systems:

100Ah GoBlock (PPS12100)*
50Ah GoBlock (PPS12050)*
*when used in unison with the PowerDock docking station